Large sheets of wall steel are easy to place in a tunnel–form wall, making it ideal when a fast turn-around of forms is critical to the jobs success. Some jobs have utilized sheets of WWR that cover an entire wall in one piece. At the top of the wall the horizontal wires are omitted, leaving just the vertical steel running thru the joint acting as dowels protruding into the wall above.